References

INBIOGAS counts with wide experience in gas management projects, INBIOGAS provides our customers with optimised use of our Know-How, deep knowledge of the best techniques and capacity to fulfill customers requirements, with optimum quality, minimum cost and high efficiency. Our technicians have been working in the landfill gas and biogas sector since the early 90´s.

Our main references include:

  • Supply of diverse equipment for landfill gas management (MRS, well heads, sampling systems, …) and compact flaring system. Capacity: 300 Nm3/h. Location: Urteta Landfill (Guipuzcoa – Spain) 
  • Full design, construction and start up service of a sewage gas management system, fully automatic, including a High Temperature Flare .Capacity: 500 Nm3/h. CDM PROJECT.Location: Santa Cruz de la Sierra (Bolivia) 
  • Full design, construction and start up service of a sewage gas management system, fully automatic, including a High Temperature Flare .Capacity: 1000 Nm3/h. CDM PROJECT. Location: Santa Cruz de la Sierra (Bolivia) 
  • Wells and piping netword conditioning.Location: Las Dehesas landfill (Madrid-Spain). 
  • Supply and start up of a compact fully automatic MRS. Capacity: 1.500 Nm3/h. Location: Arico Landfill (Tenerife-Spain) 
  • Preventative and corrective maintenance contract. Location: Argalario Landfill (Vizcaya-Spain) 
  • Preventative and corrective maintenance. Location: Cerceda (Coruña) and Zonzamas (Lanzarote). 
  • Start up service in the central equipment installed in Arico landfill. Capacity: 2.000 Nm3/h. Location: Arico Landfill (Tenerife-Spain) 
  • Supply, construction and start up of an expansión of the landfill gas management facilities. Capacity: 700 Nm3/h. Location: Gardelegui landfill (Alava-Spain) 
  • Supply and start up of a complete landfill gas system (Wells, gas network and compact flaring system). Capacity: 200 Nm3/h. Location: Aranda de Duero (Spain) 
  • Installation of a gas network. Capacity: 150Nm3/h. Location: Ourense landfill (Galicia-Spain) 
  • Updating of the management and valorization system to improve the rentability of the electricity generation engine. Capacity: 700 Nm3/h. Location: Salamanca Landfill (Spain) 
  • On-site assesment and viability report. Location: Bikkarane (Agadir-Marruecos). 
  • Full design, construction and start up service of a landfill gas management system, fully automatic, including a compact flare. Capacity: 200 Nm3/h. Location: Teixeiro (Lugo). 
  • Preventative and corrective maintenance service. Location: Segovia (Spain). 
  • Full design, construction and start up service of a landfill gas management system, fully automatic, including a compact Flare and a power generation system. Capacity: 200 Nm3/h. Location: Piñor (Santiago de Compostela-Spain) 
  • Full design, construction and start up service of a landfill gas management system, fully automatic, including a compact flare and a power generation system. Capacity: 200 Nm3/h. Location: Ourense 
  • Full design, construction and start up service of a High Temperature Flare. Capacity: 1.500 Nm3/h. Location: Gongora (Pamplona) 
  • Full design, construction and start up service of three landfill gas management systems, including compact flares in closed landfills sites. Location: Ejea de las Caballeros, Huesca y Alcañiz. 
  • Full design, construction and start up service of a landfill gas management system, fully automatic, including a compact flare and a power generation system. Capacity: 1.000 Nm3/h . Location: Albacete. 
  • Full design, construction and start up service of a landfill gas management system, including a compact Flare and a power generation system. Capacity: 100 Nm3/h. Location: Ferrol (La Coruña). 
  • Full design, construction and start up service of a landfill gas management system, including a compact Flare. Capacity: 200 Nm3/h. Location: Pontevedra. 
  • Construction and start up of landfill gas management systems in 2nd and 3rd cells. Location: Las Dehesas (Madrid). 
  • Construction and start up service of biogas transport facilities. Location: Quinta do Conde (Lisboa). 
  • Construction and start up of landfill gas management systems in 3rd cell. Location: Cerceda (La Coruña). 
  • Construction and start up service of new landfill gas facilities. Location: Urteta (Guipuzcoa). 
  • Full design, construction and start up service of a compact flare. Capacity: 200 Nm3/h . Location: Arico (Tenerife). 
  • Drilling of 14 new landfill gas wells. Location: Onda (Castellón) 
  • Preventative and corrective maintenance service. Location: Torrejón de Ardoz, Alcalá de Henares, Nájera and Lorca. 
  • Full design, construction and start up service of a compact flare. Capacity: 200 Nm3/h . Location: Cáceres. 
  • Site survey in a landfill.  Location: Los Barrios (Cádiz). 
  • Site survey in a landfill. Location: Casares (Málaga). 
  • Full design, construction and start up service of a landfill gas management system, including a compact Flare. Capacity: 200 Nm3/h. Location: Pontevedra. 
  • Full design, construction and start up service of a landfill gas compact Flare. Capacity: 250 Nm3/h. Location: Cervera del Maestre (Valencia). 
  • Updating and expansion of the management and valorization system. Location: Góngora (Pamplona)